Case #5
Replacement of coping and water line tile

The pool was emptied and acid cleaned. The existing exposed aggregate coping and water line tile were removed. Rotted concrete behind the old tile was removed and replaced.

New Indiana Limestone coping and waterline tile were installed. The exposed aggregate stones next to the pool were lifted and re-laid. A new marbleite finish was applied to the pool interior.