Case #1 Interior and Exterior Refinishing
The pool was emptied and acid cleaned. The existing pre-cast coping was removed and the existing waterline tile repaired. New Indiana Limestone coping was installed and a new marbleite finish applied to the pool interior.
The pool was emptied and acid cleaned. The existing pre-cast coping was removed and the existing waterline tile repaired.
New Indiana Limestone coping was installed and a new marbleite finish applied to the pool interior.
Return to Main Renovations Page